Plumbing and bathroom renovations in Hokkaido
From a leaking pipe to a whole new bathroom. We find the problem, quote the fix and manage the work with our Otaru contractors while you're overseas, and we show you what recent jobs cost.
Cold winters and empty houses are hard on pipes.
Frozen pipes
A house left empty in a Hokkaido winter can split a pipe overnight. Old iron pipework is the usual weak point. Replacing it, adding drain-down points and winterizing before you leave all cut the risk.
Hidden leaks
A water bill that suddenly jumps is often the first sign. We find the leak, fix it and check the rest of the run while the floor or wall is open.
Unit baths take time to arrive
Most Japanese bathrooms are prefabricated unit baths. Fitting one takes a day or two, but ordering it can take weeks, longer when supply is tight. We order early and plan the rest of the job around the delivery.
What recent plumbing jobs cost
These are amounts we billed clients in 2026, including our coordination fee and tax. Your house will differ, but this is the real range so far.
Managed on the ground, wherever you are.
Call and deposit
Book a call and tell us about the house. A $1,000 deposit starts the quote and is credited toward the work.
Inspection and quote
Our contractor inspects the pipes, bathroom or kitchen. You get photos, a plain-English summary of what's needed and a quote in yen.
Work and sign-off
We order the parts, schedule the trades, send photo updates and check the finished work before you pay the balance.
Leaving the house empty this winter? Our winterization service shuts the water down properly before you go, so you don't come back to a burst pipe.
Bathrooms and plumbing we've done
Tim & Allie's new shower room
Bathroom, washroom and toilet floor renovated, plus a whole new shower room added, as part of a bigger renovation in Sapporo.
Tom's pipes and unit bath
Old iron pipes swapped for plastic, drainage added to stop them freezing, and a new unit bath fitted in Tenguyama.
Odin's kitchen and bathroom
A new system kitchen and bathroom counter, with the sink moved to make room for a washing machine.
Plumbing questions, answered
How much does plumbing work cost in Hokkaido?
Our recent jobs ran from about ¥40,000 for a small leak repair to about ¥4.3 million for a renovated bathroom plus a new shower room, including our coordination fee and tax. A new vanity came to about ¥530,000.
How long does a bathroom renovation take?
Fitting a unit bath takes a day or two on site. The wait for the unit itself is usually the longest part, so we order as soon as the quote is approved.
Can I add a second bathroom?
Often, yes. It depends on where water and drainage can reach. Our contractor checks that first, then quotes. We've added shower rooms and second toilets to several houses.
How do I stop pipes freezing while I'm away?
Have the house winterized before you leave, so the water is shut off and the pipes are drained. Our winterization service normally costs ¥49,500. For houses with old pipework, replacing it is the longer-term fix.
Can you manage it while I'm overseas?
Yes. Most of our clients are. We handle the contractor, translate the quote, send photos during the work and invoice you in yen.
What if the house isn't connected to the sewer?
Some rural houses still use a holding tank instead of a sewer connection. It's fixable, but it's a bigger job, so we flag it early and quote it separately.
Leak, cold pipes or a bathroom you'd rather not use?
One call and an inspection will tell you what the house needs and what it will cost.
