A new shower room in a Teine house
Bathroom, washroom and toilet floor renovated, plus a whole new shower room added, as part of a bigger renovation in Sapporo.
One bathroom wasn't enough for a house the owners planned to share with guests.
Bathroom, washroom and toilet floor renovated and a new shower room added. A new downstairs vanity followed later.
It ran alongside a lot of other work in the same house, including the kitchen, a sauna, the garden and licensing, so trades had to be scheduled around each other.
The story
Tim and Allie's house in Teine, on the west side of Sapporo, was one of our biggest renovations of 2026. The kitchen, a sauna, the garden, lighting, furniture and the rental license were all part of it. The bathrooms were the largest single piece.
Adding a shower room
With guests in mind, one bathroom wasn't going to be enough. Our contractor worked out where water and drainage could reach, and a whole new shower room was added. At the same time the existing bathroom and washroom were renovated and the toilet floor redone.
Fitting it around everything else
With several trades in the house at once, the bathroom work had to be sequenced around the kitchen delivery, the sauna and the garden. Hana kept the schedule, and the bathroom and shower room were finished by August 2026.
A second round
Once the house was in use, Tim and Allie asked for the downstairs vanity to be replaced too. It was a short, separate job that autumn.
Photos
Got a job like this one?
Tell us about the house and we'll tell you what it needs and what it will cost.
