Case study
Otaru (Tenguyama)

New pipes and a unit bath in Tenguyama

Old iron pipes swapped for plastic, drainage added to stop them freezing, and a new unit bath fitted in Tenguyama.

The problem

Old iron pipes that could freeze and split in winter, and a tired bathroom.

What we did

Iron pipes replaced with plastic, drainage added so the system can be drained down, and a new unit bath fitted, as part of a larger renovation that also included main electrical line work.

What made it tricky

Work had to wait for materials to arrive, so the job was planned around the delivery rather than a fixed start date.

Client
Tom
Materials
Timeline
August to November 2026.
Cost
Part of a larger renovation, so the plumbing wasn't billed on its own.