Case study
Otaru (Hoshimi)

A new kitchen and bathroom counter in Hoshimi

A new system kitchen and bathroom counter, with the sink moved to make room for a washing machine.

The problem

An older kitchen and bathroom, with no good spot for a washing machine.

What we did

A fitted system kitchen and a new bathroom counter, with the sink moved for a washing machine, as part of a wider renovation with new wallpaper, flooring and lighting.

What made it tricky

Moving the sink meant moving water and drainage, so the layout had to be settled before anything was ordered.

Client
Odin
Materials
Timeline
June to November 2026, alongside the rest of the renovation.
Cost
About ¥940,000 for the kitchen and bathroom, including our fee and tax.

Got a job like this one?

Tell us about the house and we'll tell you what it needs and what it will cost.