Case study
Otaru (Tenjin)

A roof surprise in the middle of a ryokan renovation

Serious roof problems surfaced halfway through a renovation in Otaru. We re-scoped, rebuilt the roof in metal and got the house through its fire inspection.

The problem

Major roof problems were found mid-renovation, after work had already started.

What we did

Roof rebuilt as part of a full renovation for licensed lodging use.

What made it tricky

The problem only showed once the house was opened up, so scope and budget had to change while the job was running.

Client
Mark
Materials
Metal roofing.
Timeline
Completed in spring 2026.
Cost
The roof was not billed separately. The whole renovation came to about ¥10 million.

Got a job like this one?

Tell us about the house and we'll tell you what it needs and what it will cost.